Chen Bin

facebook_page
twitter_page

Last quote by Chen Bin

The Badaling station will be located 102 meters (335 feet) below the surface, with an underground construction area of 36,000 square meters (387,501 sq feet), equal to five standard soccer fields, making it the deepest and largest high-speed railway station in the world.feedback
share this quote
Sep 29 2016
The Badaling station will be located 102 meters (335 feet) below the surface, with an underground construction area of 36,000 square meters (387,501 sq feet), equal to five standard soccer fields, making it the deepest and largest high-speed railway station in the world.” said Chen Bin on this article: China to build deepest, largest high-speed rail station at Great Wall. This page contains 1 article quoting Chen Bin. Main topics on which Chen Bin is quoted are Badaling and meter. In addition you’ll find 1 quote there. All these quotes are mentioned on this page and you can filter them by date and by topics.
Automatically powered by Storyzy
Take our quote verification challenge and find out !
<
>
facebook_page
twitter_page
This webpage has been created by a robot: errors and absent quotes cannot be totally avoided
 
Feedback×

Quote :

Mistake :

Comments :